Drumbeat 1.0.321 · Updated 2026-09-28
Change dates after content exists
Changing campaign dates or daily cadence can move fitting items to new slots. Items that no longer fit appear in Un-scheduled Content for review. Revisit the content list after changing a schedule; do not assume overflow items will be sent automatically.
Check before launch
- Confirm selected channels and provider connections.
- Review generated copy and destination URLs.
- Check recipient lists or social profiles.
- Verify dates, timezone, and any unscheduled content.
- Use the campaign’s scheduling or launch action and inspect resulting states.
Interpret results
Campaign reports combine selected KPIs with communications send totals and available landing-page engagement. Metrics that need a provider or analytics source may not be available. An unavailable metric should not be treated as zero performance.
Use communication-level reports and logs for individual sends. Changes to a brief do not retroactively change a message that was already delivered.